Argentina, 110 MW

Lincoln: 13 Cat® XQ2000 Power Modules @ 50Hz @1400kw
Salto: 18 Cat® XQ2000 Power Modules @ 50Hz @1400kw
Standby: 16 Cat® XQ2000 Power Modules @ 50Hz @1400kw
Esquina: 13 Cat® XQ2000 Power Modules @ 50Hz @1400kw
Bariloche: 14 Cat® XQ2000 Power Modules @ 50Hz @1400kw

Locations:
•Lincoln (15 MW)
•Salto (22.5 MW)
•Standby (20 MW)
•Esquina (16.5 MW)
•Bariloche (20.0 MW)

Client: ENARSA

Electrical output: ICE 110 MW

Term: 36 months

Initial date:
•Lincoln : January 2011
•Salto: January 2011 – February 2011
•Standby: January 2011
•Esquina: January 2011
•Bariloche: July 2011

Value:
•New Equipment: US $40 million
•Total Equipment US $75 million

Coverage:
•US$ dollar contracts
•Political risk insurance
•Currency inconvertibility insurance