Philippines Case Study

Click here to view the project fact sheet.

General Santos, Philippines

    • CLIENT: Socoteco II – South Cotabato II Electric Cooperative Inc.
    • FUEL: Diesel
    • EQUIPMENT: 14 x CAT PM1360 Power Modules
    • APPLICATION: Utility
    • ELECTRICAL OUTPUT: 15 MW
    • CONTRACT PERIOD: 24 months
    • INSTALLATION: July 2013
    • LOCATION: General Santos, Philippines